INDUSTRIAL PERFORMANCE ENGINEERING · HOUSTON, TEXAS

From kiln, mill and boiler findings to verified MWh, downtime and waste results.

Planned Industrial Performance Services (Texas) carries cement, construction materials and bioenergy plants from a recorded baseline to a measured result: diagnosis, a ranked action register, a shutdown-aware implementation roadmap and a before-and-after verification report.

Every indicator is normalized per ton produced or per scheduled hour, so a change in production volume never hides or invents a gain. Each diagnosis and verification report is reviewed and signed off by our technical lead before it reaches your plant team.

See how a baseline is recorded
Cement & clinker linesEthanol & cogenerationMWh per tonAvailability %Shutdown planningBefore-and-after M&V
Cement materials-testing laboratory at dusk, with compression press, mortar molds, sieve stack and kiln readings
MATERIALS TESTING · PLANT-LEVEL PRECISIONHOUSTON, TX

From baseline to a verified result

Sample Data
0.140.120.100.08NovJanMarMayJulOct
MWh/tRecorded baseline
Persistence check, 90 days
0.10610.2%
91.4 %4.2 pp
25.9%

of U.S. industrial energy use in Texas

U.S. EIA · SEDS · 2024
≈ 44%

of U.S. cement output in four leading states

USGS · Mineral Commodity Summaries · 2026
23,000+

manufacturers assessed by federal programs

U.S. DOE · Industrial Training and Assessment Centers
240,400

Houston-area manufacturing jobs

U.S. BLS · Aug 2026; U.S. Census Bureau · 2023
THE GAP BETWEEN AN ASSESSMENT AND A RESULT

U.S. federal plant assessments leave about seven recommendations per facility. Executing them around production is the hard part.

23,000+

23,000+ manufacturers assessed and 161,200+ recommendations issued

U.S. DOE, Industrial Training and Assessment Centers
25.9%

Texas: about 25.9% of U.S. industrial energy use in 2024

U.S. EIA, State Energy Data System
≈ 44%

Texas, Missouri, California and Florida: about 44% of U.S. cement output in 2025

USGS, Mineral Commodity Summaries 2026
"The cement industry has complex operational characteristics and requires solutions capable of delivering technological advances without compromising production stability or the technical requirements of the market."

Renan de Paula, Quality Manager, Votorantim Cimentos North America · letter of intent, October 13, 2026

Baseline normalization: indicator ÷ tons produced · hours available ÷ hours scheduled
ONE PROJECT RECORD PER PLANT

Baseline, action register, outage schedule and verification share the same indicators.

A number entered once in the baseline is the number used in the plan, the roadmap and the M&V report. Completed projects feed a cumulative results ledger across every plant served.

View sample record
A SCOPED ENGAGEMENT. A MEASURED RESULT.

Start with your plant’s baseline.

Enos de Meira Silva · Founder and technical lead · Production engineer