PLT-A-CEM
Baseline Registry
Record normalized indicators and lock the reference for every measured result.
Sample Data
Sample Data · Illustrative project record. Client sign-in
12,840 MWhSample Data
0.118 MWh/tSample Data
3.42 GJ/tSample Data
87%Sample Data
7 / monthSample Data
42 hSample Data
8.5 t / 1,000 tSample Data
Energy intensity vs baseline (MWh/t, 12 months)
Plant A · MWh/tPlant B · MWh/tPlant C · MWh/tRecorded baseline
Normalization
indicator ÷ tons produced
hours available ÷ hours scheduled
Recorded output and scheduled hours belong to the same measurement period.
Availability normalization
Baseline periods
| Plant | Indicator | Period | Value | Lock status | Locked by |
|---|---|---|---|---|---|
| PLT-A-CEM | mwh_per_t | 2025-11-01 | 0.118 MWh/t | verified | Technical lead |
| PLT-A-CEM | mwh_per_t | 2025-12-01 | 0.118 MWh/t | Technical lead | |
| PLT-A-CEM | mwh_per_t | 2026-01-01 | 0.118 MWh/t | Technical lead | |
| PLT-A-CEM | mwh_per_t | 2026-02-01 | 0.118 MWh/t | Technical lead | |
| PLT-A-CEM | mwh_per_t | 2026-03-01 | 0.118 MWh/t | Technical lead | |
| PLT-A-CEM | mwh_per_t | 2026-04-01 | 0.118 MWh/t | Technical lead | |
| PLT-A-CEM | mwh_per_t | 2026-05-01 | 0.118 MWh/t | Technical lead | |
| PLT-A-CEM | mwh_per_t | 2026-06-01 | 0.118 MWh/t | Technical lead | |
| PLT-A-CEM | mwh_per_t | 2026-07-01 | 0.118 MWh/t | Technical lead | |
| PLT-A-CEM | mwh_per_t | 2026-08-01 | 0.118 MWh/t | Technical lead | |
| PLT-A-CEM | mwh_per_t | 2026-09-01 | 0.118 MWh/t | Technical lead | |
| PLT-A-CEM | mwh_per_t | 2026-10-01 | 0.118 MWh/t | Technical lead | |
| PLT-A-CEM | availability_pct | 2025-11-01 | 86 % of scheduled hours | verified | Technical lead |
| PLT-A-CEM | availability_pct | 2025-12-01 | 86.45 % of scheduled hours | Technical lead | |
| PLT-A-CEM | availability_pct | 2026-01-01 | 86.9 % of scheduled hours | Technical lead | |
| PLT-A-CEM | availability_pct | 2026-02-01 | 87.35 % of scheduled hours | Technical lead | |
| PLT-A-CEM | availability_pct | 2026-03-01 | 87.8 % of scheduled hours | Technical lead | |
| PLT-A-CEM | availability_pct | 2026-04-01 | 88.25 % of scheduled hours | Technical lead | |
| PLT-A-CEM | availability_pct | 2026-05-01 | 88.7 % of scheduled hours | Technical lead | |
| PLT-A-CEM | availability_pct | 2026-06-01 | 89.15 % of scheduled hours | Technical lead | |
| PLT-A-CEM | availability_pct | 2026-07-01 | 89.6 % of scheduled hours | Technical lead | |
| PLT-A-CEM | availability_pct | 2026-08-01 | 90.05 % of scheduled hours | Technical lead | |
| PLT-A-CEM | availability_pct | 2026-09-01 | 90.5 % of scheduled hours | Technical lead | |
| PLT-A-CEM | availability_pct | 2026-10-01 | 90.95 % of scheduled hours | Technical lead | |
| PLT-A-CEM | failures_per_month | 2025-11-01 | 7 failures/month | verified | Technical lead |
No improvement percentage is carried from one plant to another.