PLT-A-CEM

Baseline Registry

Record normalized indicators and lock the reference for every measured result.

Sample Data
Sample Data · Illustrative project record. Client sign-in
12,840 MWhSample Data
0.118 MWh/tSample Data
3.42 GJ/tSample Data
87%Sample Data
7 / monthSample Data
42 hSample Data
8.5 t / 1,000 tSample Data

Energy intensity vs baseline (MWh/t, 12 months)

0.140.120.100.08NovJanMarMayJulOct
Plant A · MWh/tPlant B · MWh/tPlant C · MWh/tRecorded baseline

Normalization

indicator ÷ tons produced
hours available ÷ hours scheduled
Recorded output and scheduled hours belong to the same measurement period.

Availability normalization

Baseline periods

PlantIndicatorPeriodValueLock statusLocked by
PLT-A-CEMmwh_per_t2025-11-010.118 MWh/tverifiedTechnical lead
PLT-A-CEMmwh_per_t2025-12-010.118 MWh/tTechnical lead
PLT-A-CEMmwh_per_t2026-01-010.118 MWh/tTechnical lead
PLT-A-CEMmwh_per_t2026-02-010.118 MWh/tTechnical lead
PLT-A-CEMmwh_per_t2026-03-010.118 MWh/tTechnical lead
PLT-A-CEMmwh_per_t2026-04-010.118 MWh/tTechnical lead
PLT-A-CEMmwh_per_t2026-05-010.118 MWh/tTechnical lead
PLT-A-CEMmwh_per_t2026-06-010.118 MWh/tTechnical lead
PLT-A-CEMmwh_per_t2026-07-010.118 MWh/tTechnical lead
PLT-A-CEMmwh_per_t2026-08-010.118 MWh/tTechnical lead
PLT-A-CEMmwh_per_t2026-09-010.118 MWh/tTechnical lead
PLT-A-CEMmwh_per_t2026-10-010.118 MWh/tTechnical lead
PLT-A-CEMavailability_pct2025-11-0186 % of scheduled hoursverifiedTechnical lead
PLT-A-CEMavailability_pct2025-12-0186.45 % of scheduled hoursTechnical lead
PLT-A-CEMavailability_pct2026-01-0186.9 % of scheduled hoursTechnical lead
PLT-A-CEMavailability_pct2026-02-0187.35 % of scheduled hoursTechnical lead
PLT-A-CEMavailability_pct2026-03-0187.8 % of scheduled hoursTechnical lead
PLT-A-CEMavailability_pct2026-04-0188.25 % of scheduled hoursTechnical lead
PLT-A-CEMavailability_pct2026-05-0188.7 % of scheduled hoursTechnical lead
PLT-A-CEMavailability_pct2026-06-0189.15 % of scheduled hoursTechnical lead
PLT-A-CEMavailability_pct2026-07-0189.6 % of scheduled hoursTechnical lead
PLT-A-CEMavailability_pct2026-08-0190.05 % of scheduled hoursTechnical lead
PLT-A-CEMavailability_pct2026-09-0190.5 % of scheduled hoursTechnical lead
PLT-A-CEMavailability_pct2026-10-0190.95 % of scheduled hoursTechnical lead
PLT-A-CEMfailures_per_month2025-11-017 failures/monthverifiedTechnical lead
No improvement percentage is carried from one plant to another.