PLT-A-CEM
Measurement & Verification
Measure before and after, check persistence and release reviewed reports.
Sample Data
Sample Data · Illustrative project record. Client sign-in
Before / after normalized outcomes
Baseline vs post · % of scheduled hours
Persistence checks
30 days90 days180 days
Energy intensity vs baseline (MWh/t, 12 months)
Plant A · MWh/tPlant B · MWh/tPlant C · MWh/tRecorded baseline
Verification coverage
M&V reports
| Report ID | Plant | Type | Submitted by | Age | Status | Actions |
|---|---|---|---|---|---|---|
| DX-PLT-A-001 | PLT-A-CEM | diagnosis | Process engineer | 2 days | in review | |
| DX-PLT-B-002 | PLT-B-ETH | diagnosis | Reliability engineer | 4 days | in review | |
| MV-PLT-A-001 | PLT-A-CEM | mv | Energy engineer | 1 days | in review | |
| DX-PLT-C-001 | PLT-C-AGG | diagnosis | Plant engineer | 0 days | draft | |
| DX-PLT-C-002 | PLT-C-AGG | mv | Plant engineer | 2 days | draft | |
| DX-PLT-C-003 | PLT-C-AGG | diagnosis | Plant engineer | 4 days | released | |
| DX-PLT-C-004 | PLT-C-AGG | mv | Plant engineer | 6 days | released | |
| DX-PLT-C-005 | PLT-C-AGG | diagnosis | Plant engineer | 8 days | released |
A first-month gain that fades is reported differently from a sustained one.